By March 3rd the mower bay garage door was installed (it required 9’ high tracks to clear an 8’ high doorway into the bay. The exterior of the house was painted on March 12th. The remaining work on the exterior is the gutters, replacing the counterflashing on the eaves, and powerwashing of the exterior. There is also alot of debris to be hauled away from the cabinet, tile, sheetrock, plumbing, and electrical installation. These pictures were taken on March 17th.